Description
The unit is designed for supplying process liquids under pressure by plunger pumps during cementing, hydraulic jet perforation, bottom zone acidizing, oil and gas wells killing, washing out sand plugs and other washing and squeezing jobs, carried out on oil and gas fields.<br />
Components:
Chassis with wheel arranegment 8x8
Two drive diesel engines
Two automatic gearboxes
Two driveshafts
Two triplex plunger pumps
Mixing tank
Measuring tank
Averaging tank
Water supply pump
Circulation pump
Supercharger pump
Hydraulic system
Suction and discharge manifolds
Element of autonomous heating of equipment
Tent
Control and measurement devices
Working platform with remote control
Specifications:
Maximum triplex plunger pump pressure, MPa: 75
Triplex plunger pump total output, m3/min: 3,2
Solution density range, g/cm3: 1,0-2,5
Maximum capacity of cement mixing system, m3/min: 2,3
Water supply pump maximum flow, L/s: 3,6
Water supply pump maximum pressure, MPa: 0,9
Recirculation pump maximum flow, L/s: 50
Recirculation pump maximum pressure, MPa: 0,35
Supercharger pump maximum flow, L/s: 40
Supercharger pump maximum pressure, MPa: 0,15
Mixing tank volume, m3: 1,1
Averaging tank volume, m3: 1,5
Measurement tank volume, m3: 4(2x2)
Operating temperature range, degrees C: -40 - +40
- Cementing unit
- cementing complex
- oil and gas
- hydraulic jet perforation
- bottom zone acidizing
- oil and gas wells killing
- washing out sand plugs
Production Capacity:
Not informed
Delivery Timeframe:
Not informed
Incoterms:
Not informedPackaging Details:
Not informed
More about
TRUST-ENGINEERING LLC
Not informed
Not informed
Not informed
Year
Established
Business type
- Industry / Manufacturer
- Importer / Trading Company
Keywords
- hydraulic fracturing
- coiled tubing
- high-preasure triplex plunger pumps
- units for cementing
- units for heating
Contact and location
- Natalya Fokina
- +7 863 xxxxxxxx
- Rostov-on-Don / | Russian Federation